LIVE OPERATION INSTALLATION- GRAIN PROCESSING, SK LARGE FOOD PLANT: RENOVATION SureBond cannot perform any work without power. SureBond has two distribution units, that can provide power from 208V, 480V, or 600V feeds. SureBond often works in wet or potentially wet environments. Our distribution systems are unique: they not only have inherent ground fault protection, but the high voltage 208V circuits are also protected with fault protection that limits the exposure to the employee to a non lethal level. The power distribution system provides all power needs, which minimizes to only one or two circuits for what General Contractors or Plant Electricians need to supply our potential 10 to 20 consumer circuits on a project. Surface Prep. Surface Prep. Surface prep. Many thousands of ft of crack had to be routed, primed, and filled using Silikal RV368 resins. The filled cracks are the last possible way for water to leak through the floor. There are 6 layers of resin ON TOP of the filled crack. Coving and bonding to the stainless steel. No problem with Silikal priming resins and surface prep. This detail eliminates water leakage through the floor from this "high wet" production area. Preparation for floor installation begins. Our surface prep and floor laying activities actively be silica dust-free in order to protect our employees and your staff. SureBond created a "bath tub" floor to prevent leaks through the concrete below to production areas below. Cracking risk through the concrete has been almost eliminated in the first 5 years of operation ....so far! Our coving never peels from the floor or wall. Nor is there any ever leak under the cove into areas behind the wall. All of the floor installed is hermetically sealed from production areas below. Many penetrations through the finished floor to produce no-leak performance. Electrical conduit, clean outs, drains, grease traps: no water or sanitation chemicals can leak through the floor for food-safety reasons. Corroded steel has been protected from corrosive sanitation chemicals such as bleach. Rust was removed dust-free in an operating plant environment. Five months of safe work completed in a live food plant. No safety or quality incidents. No plant downtime. Completed one month ahead of schedule. SureBond's certificate recognizing our pride in our team's work rests in the floor for the next 20 years, with some maintenance for boo-boo's along the way. Business Inquiries.(403) 269 6888Unit 10 - 6420 79 Ave SECalgary, AB T2C 5M4