Hopcott Farms, Pitt Meadows, BC : New Abattoir
red Meat - abattoir: hygiene critical® floor and cove
Project Date: 2022
Facility:
This was an easy build for SureBond, with a new slab that slab was perfectly sloped. The flooring was specified by the client as SILIKAL® R61 CQ High Anti Slip for Plant Area and Silikal R62 Micro-flake for the Admin area. The client wanted the Admin area to be easier to clean, due to trackage from the plant to admin.
Damage can occur during construction. During construction, the harvest floor had a 4 impact holes that penetrated through the finished Silikal® R61 floor into the concrete. We fixed the holes in about 1 hour. Months later, we cannot even see the repair location. These repairs are permanent, as promised.
Client and staff are very happy with the floor. Floor is easy clean AND non slip. Cleans all harvest materials on floor with a hose: no pressure washer required. This floor will easily be in operation for 20 years, with maintenance for abuse.
Animal Welfare Flooring was included in the harvesting area, as it helps in keeping the animal calm. SureBond has much experience in Production and Processing Animal Welfare.
Business Inquiries.
(403) 269 6888
Unit 10 - 6420 79 Ave SE
Calgary, AB T2C 5M4